Project Information
-
Owner
National Chiropractic Mutual Insurance Company
-
Location
Clive, IA
-
Architect
OPN
-
General Contractor
Ryan Companies
-
Engineer
KJWW
-
Square Footage
120,000
-
Baker Group Scope
Mechanical Cost - $2,600,000
-
Year Completed
2003
Baker Group was selected as the mechanical contractor for this state-of-the-art corporate office for NCMIC. The building utilizes variable air volume heating and cooling systems and energy recovery ventilator (ERV) to temper outdoor air.
Included in this building is a Training/Conferencing Center and Data Room with dedicated environmental equipment. The building is equipped with a DDC Control System utilizing Invensys controls.