MedPharm Iowa T.I. Build-Out
Designing, building and getting Iowa’s first medical cannabis grower/manufacturer up and running within 9 months was a quite a... Learn More
From high-profile commercial office and mission-critical facilities to educational and retail buildings, Baker Group’s portfolio demonstrates our commitment to serve clients exceedingly well. Since 1963, that steadfast commitment has stimulated a steady expansion of our services.
Today Baker Group is a recognized leader in applying sophisticated technology and green/sustainable design to construction processes.
To sample true innovation, depth and versatility, click on the headings below.
Designing, building and getting Iowa’s first medical cannabis grower/manufacturer up and running within 9 months was a quite a... Learn More
DuPont Pioneer and Ryan Companies US, Inc., asked Baker Group to provide design-build mechanical, sheet metal, compressed air, and... Learn More
This project was a collaborative joint venture between private industry and the University of Iowa.
Learn MoreThis general work building features seed germination chambers, cold seed storage, laboratory areas, offices, general work areas, and... Learn More
Pioneer needed a 21st century laboratory space that included cold rooms, culture rooms, and entomology rooms. This need was satisfied by... Learn More
This project was built to lease to Pioneer Hi-Bred International as a laboratory and office space. Approximately 50% of the building is... Learn More
Baker Group was chosen as the Mechanical and Sheet Metal contractor for the Grinnell College Noyce Science Center. The design of this... Learn More
Baker Group provided complete mechanical, sheet metal, and temperature control design/build services for this complicated renovation.... Learn More
The challenge was taking unused manufacturing space and turning it into state-of-the-art R&D space for new laundry products.
Learn MoreBaker Group provided the removal of the existing air handler and installation of the new air handler with the lab area still in... Learn More
Baker Group was contracted to provide additional ventilation, plumbing and electrical service to accommodate CFS’s specific office and... Learn More
Part of DuPont Pioneer’s campus, this building provides Pioneer staff with 90,000 sq ft of lab and 90,000 sq ft of office space... Learn More