Des Moines Christian School Center for Excellence
Absolute Reliability: Educational institutions have special needs. Baker Group is paying special attention to these needs throughout... Learn More
From high-profile commercial office and mission-critical facilities to educational and retail buildings, Baker Group’s portfolio demonstrates our commitment to serve clients exceedingly well. Since 1963, that steadfast commitment has stimulated a steady expansion of our services.
Today Baker Group is a recognized leader in applying sophisticated technology and green/sustainable design to construction processes.
To sample true innovation, depth and versatility, click on the headings below.
Absolute Reliability: Educational institutions have special needs. Baker Group is paying special attention to these needs throughout... Learn More
The Cedar Rapids Community School District had been told it wasn’t possible to have a single, district-wide platform that would reduce... Learn More
Saydel Community School District worked with Baker Group to add air-conditioning to all four Saydel Schools in the district, plus an... Learn More
Baker Group completed a major mechanical construction project at East High School in 2005.
Learn MoreBaker Group evaluated the mechanical systems, prepared budgets for implementation costs, and worked with the design team to finalize... Learn More
Commissioned as the construction manager, Baker Group provided complete renovation and upgrade of the HVAC system, a remodel of the lab... Learn More